Monday, September 21, 2020

Update on the MEGA Multipath slated for Howard Drive (Palmetto Bay side only). The colors really do bring out the contrast. (an update in a series)

Is this MEGA path needed? Has anyone ever told you that they would love to go for a walk along SW 136 Street, but said they couldn’t because the existing sidewalk is too narrow?  (NOTE - this POST WAS UPDATED 9/22/2020 at 10:15 AM) 

There is a standard sized sidewalk that runs from US1 all the way to Old Cutler Road.  Who asked for this multi-path and what will it really look like? 

The plans are tough to read, so I asked for someone to use color to fill in the sidewalk and the planned MEGA path to provide prospective. The blue marks the existing standard size sidewalk. The color orange is used to mark where these plans have the MEGA sidewalk placed for the home at 8100 SW 136 Street. Note that for this home, the sidewalk is not a 4 foot extension of the existing, but a complete 8-10 foot new creation that is a full 10 feet or more closer to the existing home. This path is not straight, it meanders, meaning that the impact will not be the same (will not be uniform) for all the homes that front Howard Drive. Some may hardly notice it, but some homes will have a HUGE impact, you might say a MEGA impact.

Sources tell me that there is a grand Photo Op ceremony set for Friday, October 2nd (the last day of the current Interim Manager who put in notice of his resignation on Monday, September 21, but that was a prior story.)


9/22/2020 update: I have a section for the area adjacent and in front of Howard Drive Elementary School - see updated pic below:

Note how the path curves with the radius of the intersection like a sidewalk, unlike a bike lane. Does the radius at the Southwest corner of 136/77 foreshadow a future project, extending the concrete MEGA path to eventually travel South along 77th Avenue to Coral Reef Park?

Does the MEGA Path also curve into 82nd Avenue at the intersection of 136/82 and, if so, which side of 82nd Avenue will the continuation of this path travel down?

FAIR QUESTION: If this path is so great, so safe, then why did Pinecrest pay more money so this project would be pushed off, out of Pinecrest and solely onto Palmetto Bay residents?

THE TOOL BOX: CLICK HERE to view related past posts relating to the dismantaling of the bike lanes and substituting them with the Howard Drive MEGA PATH. 

No comments: